BMS & EPMS / REFERENCE ARCHITECTURE

Power reliability.
Cooling control.
Trusted facility data.

Understand the systems that keep critical facilities running. Follow the equipment, practice a point configuration, and test what happens when power, cooling or communication fails.

A Buntop reference facility. All readings and scenarios are simulated. This is not an AWS facility design or a live monitoring system.

01 / EXPLORE

Two operational systems.
One coordinated facility.

BMS manages environmental control. EPMS makes electrical conditions and events visible. Their responsibilities, access rights and failure dependencies must be explicit, even when they share a supervisory platform.

BUILDING MANAGEMENT SYSTEM

Keep cooling under local control.

DDC or PLC sequences regulate pumps, fans, valves and cooling equipment using local sensors, PID loops and proven equipment permissives.

  • AHU, CRAH, chiller and cooling-tower sequences
  • Chilled-water pressure, temperature and flow
  • CDU monitoring, leak detection and condensation limits
  • Alarms, trends, operator commands and override management

ELECTRICAL POWER MONITORING SYSTEM

See the electrical chain of events.

Meters, relay records and equipment interfaces reveal availability, capacity, power quality and the sequence of a disturbance.

  • Utility, switchgear, UPS, generator and PDU status
  • Voltage, current, kW, kVA, power factor and THD
  • Source-timestamped events and waveform records
  • Protection and transfer remain with approved local systems

Explore the architecture layers

These are functional groups, not fixed Purdue levels. Security zones follow the risk assessment and approved flows.

01 / FIELD EQUIPMENT

Measure the physical process.

Temperature, pressure and flow sensors inform cooling control. Power meters and breaker contacts inform electrical monitoring.

Example products
Vaisala sensors, Belimo valves and Schneider Electric PowerLogic meters; select variants for the application.
Interfaces
4–20 mA, RTD, dry contact, BACnet or Modbus where supported.
Boundary & failure behaviour
Keep field wiring and device networks within the assigned zone. Diagnose bad signals and define the local response to sensor loss.

Electrical path: source to load

A conceptual low-voltage transfer arrangement. Transformer ratings, protection, earthing, bypasses and transfer design require the approved electrical study. This illustration does not claim 2N redundancy.

Illustrative electrical supply pathUtility through a utility transformer to medium-voltage switchgear and an MV to LV transformer. The low-voltage utility source and an alternate generator feed a local automatic transfer switch, then UPS and PDU to the critical load. EPMS observes the equipment.Utility sourceHV supplyUtility transformerHV → MVMV switchgearLocal protectionTransformerMV → LVGenerator sourceCompatible LVLocal ATSSource permissivesUPSRated ride-throughPDU / distributionBranch monitoringCritical loadEPMS observes source status, events and power quality.

Transfer time and UPS autonomy depend on equipment, load and acceptance tests. Generators, ATS and protection do not rely on cloud telemetry.

Equipment & protocol reference

Illustrative options, not claims of vendor partnerships or installed client equipment. Confirm the selected model, firmware, licenses and supported interfaces.

SystemExample productsEngineering roleInterface / check
Local building controlSiemens PXC; Schneider Electric AS-PLocal sequences, PID control and equipment permissivesBACnet/IP, field I/O as supported; test loss of supervision
Building supervisionSiemens Desigo CC; Johnson Controls Metasys; Niagara N4Graphics, alarms, trends and managed operator accessSupported BACnet / integration drivers; distinguish supervisory engines from local controllers
Cooling instrumentationVaisala transmitters; Belimo Energy ValveEnvironmental measurement and hydronic valve controlAnalog / BACnet / Modbus according to variant; verify units and scaling
HVAC drives & coolingABB ACH580; York chillers; Vertiv CRAH; CoolIT CDUsMotor control, heat rejection and liquid-cooling interfacesVendor interface and sequence; verify flow proof, limits and fault response
Power-quality metersSchneider Electric PowerLogic ION9000 / PM8000Power measurements, events and supported waveform captureModbus / supported meter driver; check variant, recording settings and clock accuracy
Protective relaysSEL-751; ABB RelionLocal protection with events exposed for monitoringIEC 61850, DNP3 or Modbus where supported; telemetry does not replace protection
UPS & generationVertiv Liebert; Eaton 9395; Caterpillar / Cummins generatorsPower continuity, battery condition and source availabilityVendor gateways / contacts; test rated autonomy and actual start/transfer sequence
Power supervisionEcoStruxure Power Operation / PME; Eaton Foreseer; IgnitionOperator views, trends, event correlation and recordsSupported device drivers; waveform files and source timestamps retained separately
Edge collection & modelingOnLogic Karbon; PTC Kepware; HighByteApproved host, device drivers and contextualized telemetrySupported OPC UA / BACnet / Modbus connectors; runtime compatibility and read permissions reviewed
Security & MQTT transferSiemens SCALANCE SC-600; Eclipse Mosquitto; AWS IoT CoreDistinct firewalls, zone-local messaging and authenticated ingestionExplicit routes, client identities, TLS and topic policies; multiple NICs are not a firewall

From a sensor to AWS, across named boundaries

Example: a chilled-water supply temperature becomes a trusted, timestamped asset value. Telemetry moves north; cloud commands are not enabled in this reference design.

FACILITY OT ZONE

1. Collect & contextualize

A supported collector initiates read access to the DDC through an approved BACnet/IP interface. HighByte can model the value through a verified compatible connector.

Control: named source, read permissions where supported, approved polling load, source units and quality.

FIREWALL A / OT → DMZ

2. Publish a telemetry copy

The publisher initiates a permitted MQTT/TLS session to a DMZ broker such as Mosquitto. Separate client identities restrict publication and subscription topics.

Control: source, destination and service allowlist; certificate trust, renewal, logging and bounded queues.

FIREWALL B / DMZ → AWS

3. Relay to AWS IoT Core

A configured relay, optionally hosted on AWS IoT Greengrass V2, initiates MQTT/TLS to the named AWS IoT Core endpoint.

Control: individual client certificate and scoped IoT policy. Greengrass is a runtime; BACnet collection needs an explicit supported component.

ASSET VALUES

IoT rule → AWS IoT SiteWise

Map a defined property alias, value type, timestamp and quality. Validate per-entry ingestion errors.

HISTORICAL RECORDS

IoT rule → Firehose → Amazon S3

Optional Lambda transformation in Firehose. Use documented buffering, retention, encryption and lifecycle rules.

EVENTS & INVESTIGATION

IoT rule → Lambda / approved alerts

Route operational events separately. Retain original waveform files, such as COMTRADE, in controlled storage with links to source event records.

Firewall and DMZ transfer is the baseline here. A data diode is a different one-way architecture, not an air gap; TCP/TLS services require an engineered paired proxy or protocol termination design. Neither protocol encryption nor a dual-NIC host creates a security boundary on its own.

Timing you can trust

Separate source timestamp, collection time and cloud arrival time. A 1 ms display resolution does not prove 1 ms accuracy. Select compatible PTP / IRIG-B / NTP systems for the required error budget, and test clock loss, holdover and event ordering.

Local response you can verify

Approved protection and interlocks may use hardwired circuits or certified safety communication. Verify the entire response chain. Define loss-of-signal and restart behaviour for each asset; neither full-speed cooling nor automatic restart is a universal safe state.

02 / CONFIGURE

Turn a raw point into useful data.

Practice an illustrative 4–20 mA temperature mapping. Change scaling, alarm delay or data age and see how value, quality and the output payload change. This exercise writes no device configuration.

Point engineering worksheet

CALCULATED PREVIEW

20.000 °C
Data quality
GOOD
High alarm
NORMAL
Permission review
Read-only intent; enforce permissions in the source and connector.

Example mapping loaded.

SiteWise API request example

Alias must be assigned to an actual asset property; the asset model defines the unit. The timestamp is a fixed teaching sample, not the current time. An IoT rule must explicitly map the received message to its SiteWise action.

Linear scaling only. The example evaluates a sustained high condition against an entered duration; it is not a live alarm engine. Site alarm design also needs deadbands, latching, acknowledgement, suppression rules and validated sensor-failure handling.

03 / SIMULATE

Follow the fault.
Understand the dependencies.

Step through a teaching sequence or replay it at a readable pace. Times are scenario offsets, not measurements or equipment guarantees.

Ready. Select Next step to begin.

ILLUSTRATIVE STATE / NO PLANT CONNECTION
Utility
available
Generator
standby
ATS
utility
UPS
online

Ready to explore

Use the controls to reveal each dependency. In non-power scenarios, the electrical path remains at its baseline.

View the electrical path ↑

Sequence of events

Deterministic offsets from t=0. No fabricated live timestamps.

  1. Sequence not started.

COOLING & ENERGY EXERCISE

One assumption. A coherent energy result.

0 °C35 °C

Economizer example

Teaching thresholds: below 15 °C uses 100 kW of cooling; 15–20 °C blends linearly to 400 kW; at or above 20 °C uses 400 kW. IT load stays at 1,000 kW and other load at 100 kW.

Cooling load100 kW
Illustrative PUE1.200

Actual economizer decisions depend on the approved sequence, climate, water temperatures, humidity, dew point and equipment limits. This arithmetic is not a thermal model, a sizing tool or a promised facility PUE.

04 / COMMISSION

Turn assumptions into evidence.

Use a practice worksheet to plan FAT, SAT and integrated systems testing. A selected result here is a browser-local learning record; it does not certify that a field test was performed.

Test & expected resultResultEvidence / measured limits

Progress is saved in this browser when storage is available. Downloads include point settings, scenario progress and your worksheet notes. No information is submitted to Buntop.

Engineering deliverables

Point and asset registers, sequences of operation, alarm matrix, network and approved-flow diagrams, time synchronization plan, backups, patch procedures and recovery runbooks.

Define recovery time objective (RTO), recovery point objective (RPO), test conditions, actual restoration time and observed data gaps. Have qualified personnel carry out electrical interventions under site safety procedures.

Security through the lifecycle

Inventory assets and dependencies, assess risk using applicable IEC 62443 guidance, manage vulnerabilities and vendor-approved patch windows, and test rollback and recovery.

Maintain access policies, approved remote support, configuration backups, monitoring and OT incident response procedures. Test a permitted telemetry flow and verify an unauthorized connection is blocked.

KEEP EXPLORING

Connect facility systems to the wider plant.

Technical references & scope

This is a vendor-neutral reference with illustrative products, not a statement about any hyperscaler's internal deployments. Product capabilities depend on version and configuration. No claim of personal project experience, certification or client deployment is implied by these examples.